News

NFL plans to avoid Super Bowl power problems of ’13

NFL plans to avoid Super Bowl power problems of ’13

POWER PLAY: The 2013 Super Bowl was delayed for more than a half-hour due to power problems that left much of the stadium in the dark. Photo: Associated Press

EAST RUTHERFORD, N.J. (AP) — With the memory of last February’s Super Bowl power outage front and center, officials have laid out plans for how they plan to avoid a similar problem at MetLife Stadium in February.

The head of Public Service Electric & Gas says the utility is running a third power line into the electrical substation at the Meadowlands sports complex.

PSE&G president Ralph LaRossa said Thursday that even if two of the power lines fail, the third would be enough to power the complex.

LaRossa said the Super Bowl site will require about 18 megawatts of electricity, or about what it takes to power 12,000 homes.

A partial power outage that caused a 34-minute delay at the Superdome was blamed on an electrical relay device installed specifically to prevent a power failure.

Recent Headlines

1 hour ago in Local

On Eve of Obama Visit, Rauner Pushes Agenda

Fresh
rauner

Won't give up on "structural change"

6 hours ago in Local

Davis, LaHood Talk Presidential Visit

Barack Obama makes Thanksgiving Day phone calls to U.S. troops

The two Republican Congressmen whose districts include Springfield are ready to welcome President Obama to the Capitol.

9 hours ago in Local

U of I Menorah Vandalized Again

university illinois

A 9-foot-tall menorah at a University of Illinois Jewish student center has been damaged for a third time in less than a year.

9 hours ago in Local

Lawmaker Introduces Violent Videos Bill

local_news_generic

An Illinois lawmaker wants to criminalize recording fights in order to post them online.

10 hours ago in Local

Downtown Street Parking Ban for Obama Event

no parking

The City of Springfield has put out a list of places you can't park in the downtown area Wednesday due to President Obama's visit.